City Council · 2025-06-25 15:30 PM
Adopt Item as Amended
Majority required - PH22.3 - Adopt the item as amended
- Motion result
- Carried
- Recorded tally
- 18-7
- Source outcome
Toronto council record
Motion-level votes, outcomes, decision bodies, official item details, and ways to participate—connected to the current elected-official record, not to any candidate campaign.
917
Agenda items with votes
0
Listed committees
153
Pages of sourced history
Council accountability
Page 50 of 153
Toronto council records are cached and may be delayed while updates load. A missing record does not establish how an official voted.
Toronto is a dynamic, growing city which continues to attract newcomers, with at least 830,000 new Torontonians expected by 2051. Toronto’s Neighbourhoods present an opportunity to accommodate a component of that future growth. Allowing for additional units in multiplex building types, with the same general scale and built form characteristics of low-rise neighbourhoods, addresses Official Plan objectives to provide a wide range of housing types within our Neighbourhoods in a way that is gradual and sensitive to their context. Multiplexes are defined as a low-rise form of housing with two, three, or four units in a single building. This type of housing can support climate goals by allowing people to walk, bike, or take transit for some of their daily trips; allowing for less carbon-intensive construction; and helping to protect the regional greenspace system by better using urbanized land. It provides a housing option that can fit the needs of families, large households, and people who would prefer living in ground-related housing. It can also provide units for people to age in place in their neighbourhoods, to create housing for a family member, or to create additional unit…
City Council · 2025-06-25 15:30 PM
Majority required - PH22.3 - Adopt the item as amended
City Council · 2025-06-25 15:29 PM
Majority required - PH22.3 - Bravo - motion 1
The closure of King and Church for combined Toronto Transit Commission and watermain work is having an impact on commuters and drivers in our downtown. At the last meeting I moved a Member Motion titled “Speeding Up Streetcars: Getting People Moving Faster During King and Church Construction” directing staff to prioritize looking at additional ways to keep people moving during the construction. Currently, the Financial District Business Improvement Area and their stakeholders use loading zones on the south side of Adelaide Street West, from Yonge Street to York Street, between 10:00 a.m. to 3:00 p.m., Monday to Friday. Based on the travel time data, streetcar operations are negatively impacted when the loading operations are in effect. In consultation with the Toronto Transit Commission, Transportation Services and the Financial District have agreed that temporary loading zones will be established on the west side of York Street, between King Street West and Wellington Street, and on the north side of King Street West, between Yonge Street and York Street. Delivery drivers will queue in the new loading zones, where Traffic Control Persons will marshal the delivery driv…
City Council · 2025-06-25 10:38 AM
Two-Thirds required - MM31.17 - Waive the referral
As the Toronto Transit Commission (TTC) operates a transit service on Torbarrie Road, City Council approval of this report is required. Transportation Services has reviewed the need for pedestrian crossing protection at the intersection of Torbarrie Road and Judy Sgro Avenue. Based on the assessment undertaken, Transportation Services does not recommend the installation of pedestrian crossing protection at Torbarrie Road and Judy Sgro Avenue as the warrant criteria was not met for either a pedestrian crossover (PXO) or traffic control signals.
City Council · 2025-06-25 10:27 AM
Majority required - EY23.16 - Adopt the item
As Kipling Avenue is classified as a major arterial street, City Council approval of this report is required. Multiplex Construction Canada is constructing the new Etobicoke Civic Centre consisting of nine buildings ranging from 2 to 16 stories located at 3755 Bloor Street West. The site is located on the southeast corner of Bloor Street West and Kipling Avenue. The construction project will consist of multiple phases. This report deals with excavation and shoring and below grade formwork (Phase 1), which is scheduled to take place from June 30, 2025 to December 31, 2025. The overall project is scheduled to be completed in March 2028. The subsequent phases will be discussed in a future staff report. Phase 1 will require closure of the bicycle lane, the east sidewalk, and the dedicated northbound right-turn lane on Kipling Avenue between a point 20 metres south of Bloor Street West and a point 62 metres further south. Pedestrians on the east side of Kipling Avenue will be directed to a protected 1.8 metre wide, pathway within the closed portion of the dedicated northbound right-turn lane. Cyclists will share the road with northbound traffic on Kipling Avenue between a point 20 metr…
City Council · 2025-06-25 10:25 AM
Majority required - EY23.23 - Adopt the item as amended
Toronto is one of the top five screen-based industry hubs in North America and was named the “Best Place to Live and Work as a Movie Maker” in a survey conducted by MovieMaker Magazine in 2024. The screen sector employs more than 30,000 Torontonians, a number that is expected to continue to grow. A June 2022 consultant report identified Toronto’s film industry as a high-growth sector poised to play an outsized role in driving Toronto’s future economic development. In that same year, film and television productions spent a record $2.6 billion in Toronto. Roughly 70 percent of Toronto’s production volume comes from international projects, which are highly mobile. With more cities competing for these economic opportunities, the City must continue to enhance the attractiveness, competitiveness, and viability of Toronto’s screen sector. School sites are desirable film locations for film and television productions but can be challenging to permit due to the potential impacts on school operations. Securing an unused school as a film location would build on the xoTO Schools program by providing predictable access to a high-demand film location and suppo…
City Council · 2025-06-25 10:19 AM
Majority required - DM31.2 - Adopt the item
This report recommends approval of a Zoning By-law amendment to permit the construction of a four-storey (12.62 metres excluding the elevator overrun) residential building containing 47 new affordable rental dwelling units at 62 Orchard Park Drive. The proposed building would be located on the lands currently used as a surface parking lot adjacent to the existing West Hill United Church and Mentoring, Academic, Art Technology Youth Innovation and Cultural Centre (the "MAAT Centre"), which is to be retained and continue operating on the site. A total of 29 vehicular parking spaces are proposed to support the existing Mentoring, Academic, Art Technology Youth Innovation and Cultural Centre and the proposed development. This report recommends a Holding (H) provision on the subject site to ensure that the identified infrastructure matters are addressed to the satisfaction of the Chief Engineer, Engineering Construction Services.
Scarborough Community Council · 2025-06-05
Majority required