City Council · 2025-06-25 10:27 AM
Adopt Item
Majority required - EY23.16 - Adopt the item
- Motion result
- Carried
- Recorded tally
- 21-1
- Source outcome
- Carried, 21-1
Toronto council record
Motion-level votes, outcomes, decision bodies, official item details, and ways to participate—connected to the current elected-official record, not to any candidate campaign.
928
Agenda items with votes
0
Listed committees
155
Pages of sourced history
Council accountability
Page 51 of 155
Toronto council records are cached and may be delayed while updates load. A missing record does not establish how an official voted.
As the Toronto Transit Commission (TTC) operates a transit service on Torbarrie Road, City Council approval of this report is required. Transportation Services has reviewed the need for pedestrian crossing protection at the intersection of Torbarrie Road and Judy Sgro Avenue. Based on the assessment undertaken, Transportation Services does not recommend the installation of pedestrian crossing protection at Torbarrie Road and Judy Sgro Avenue as the warrant criteria was not met for either a pedestrian crossover (PXO) or traffic control signals.
City Council · 2025-06-25 10:27 AM
Majority required - EY23.16 - Adopt the item
As Kipling Avenue is classified as a major arterial street, City Council approval of this report is required. Multiplex Construction Canada is constructing the new Etobicoke Civic Centre consisting of nine buildings ranging from 2 to 16 stories located at 3755 Bloor Street West. The site is located on the southeast corner of Bloor Street West and Kipling Avenue. The construction project will consist of multiple phases. This report deals with excavation and shoring and below grade formwork (Phase 1), which is scheduled to take place from June 30, 2025 to December 31, 2025. The overall project is scheduled to be completed in March 2028. The subsequent phases will be discussed in a future staff report. Phase 1 will require closure of the bicycle lane, the east sidewalk, and the dedicated northbound right-turn lane on Kipling Avenue between a point 20 metres south of Bloor Street West and a point 62 metres further south. Pedestrians on the east side of Kipling Avenue will be directed to a protected 1.8 metre wide, pathway within the closed portion of the dedicated northbound right-turn lane. Cyclists will share the road with northbound traffic on Kipling Avenue between a point 20 metr…
City Council · 2025-06-25 10:25 AM
Majority required - EY23.23 - Adopt the item as amended
Toronto is one of the top five screen-based industry hubs in North America and was named the “Best Place to Live and Work as a Movie Maker” in a survey conducted by MovieMaker Magazine in 2024. The screen sector employs more than 30,000 Torontonians, a number that is expected to continue to grow. A June 2022 consultant report identified Toronto’s film industry as a high-growth sector poised to play an outsized role in driving Toronto’s future economic development. In that same year, film and television productions spent a record $2.6 billion in Toronto. Roughly 70 percent of Toronto’s production volume comes from international projects, which are highly mobile. With more cities competing for these economic opportunities, the City must continue to enhance the attractiveness, competitiveness, and viability of Toronto’s screen sector. School sites are desirable film locations for film and television productions but can be challenging to permit due to the potential impacts on school operations. Securing an unused school as a film location would build on the xoTO Schools program by providing predictable access to a high-demand film location and suppo…
City Council · 2025-06-25 10:19 AM
Majority required - DM31.2 - Adopt the item
This staff report concerns a matter for which the North York Community Council has delegated authority from City Council to make a final decision. The purpose of this report is to advise Community Council concerning an application by the property owner of 499 Briar Hill Avenue for a site-specific Fence Exemption, pursuant to Section 447-1.5(B) of Toronto Municipal Code, Chapter 447 - Fences. The property owner is seeking Community Council’s permission to maintain the follow: 1. A gate on the second story deck in the rear of the property that will not comply with the standards stipulated by Section 447-1.3(D)(1). This gate is made from tempered glass and measured at 1.06 metres in height. 2. An enclosure from the walkout basement that will not comply with the standards stipulated by section 447-1.3 (E) (1) (b). This enclosure is not located more than one metre away to any external condition that may facilitate climbing. A Notice of Violation was issued to the property owners on December 6, 2024. The property owner has implemented alternative safety measures, including an enclosure constructed from marine-grade mesh vinyl material. This enclosure, measuring 1.2 metres in heigh…
North York Community Council · 2025-06-04
Majority required
The Toronto Urban Health Fund (TUHF) provides grants to community-based HIV prevention and substance use initiatives. This report outlines the Toronto Urban Health Fund’s program criteria and priorities, application review process, and 2025 grant recommendations for Board of Health approval. The 2025 Toronto Urban Health Fund Review Panel recommends granting $645.4 thousand for seven (7) one-year projects and $1,679.2 thousand for fifteen (15) three-year projects that were approved in 2023. The grants total $2,324.6 thousand for the twenty-two (22) projects and are to be used between July 1, 2025 and June 30, 2026. The 2025 recommended projects for Toronto Urban Health Fund grant funding focus on HIV prevention through sexual transmission, harm reduction, and child and youth resiliency.
Board of Health · 2025-06-03
Majority required
Board of Health · 2025-06-03
Majority required
In December 2024, The City of Toronto unveiled the sites of six new shelter locations that are planned to be developed in accordance with the City’s 10-year Homelessness Services Capital Infrastructure Strategy, approved by Council in November 2023. The City has delegated the public consultation process to the Community Engagement Facilitator Public Progress team. They have been tasked with providing ongoing shelter updates, responding to questions and working collaboratively with the City and local community members. In coordination with Toronto Shelter and Supportive Services, City staff recently determined that addressing planning entitlement matters through a collective approach for the six sites, as opposed to a site-by-site process. Community consultation sessions and public engagement campaigns have taken on a generalized approach which does not appropriately reflect the needs and concerns of local communities which will be impacted by the six new proposed shelters.
City Council · 2025-05-22 21:20 PM
Majority required - MM30.6 - Defer the item