City Council · 2026-02-04 15:39 PM
Amend Item (Additional)
Majority required - TE28.27 - Fletcher - motion 1
- Motion result
- Carried
- Recorded tally
- 22-0
- Source outcome
- Carried, 22-0
Toronto council record
Motion-level votes, outcomes, decision bodies, official item details, and ways to participate—connected to the current elected-official record, not to any candidate campaign.
925
Agenda items with votes
0
Listed committees
155
Pages of sourced history
Council accountability
Page 28 of 155
Toronto council records are cached and may be delayed while updates load. A missing record does not establish how an official voted.
City Council, through TE4.70, directed City staff to report to Toronto and East York Community Council (TEYCC) on a semi-annual basis with updates on the status and progress of Metrolinx’s Ontario Line construction in Toronto-East York. This report provides updates on: - Ontario Line South construction updates and station-specific issues; - Other project-wide construction issues and responses, such as haul routes and construction mitigation approaches; - Community engagement; - Metrolinx’s Community Benefits and Supports Program; and - Progress on the Ontario Line Subcommittee Recommendations.
City Council · 2026-02-04 15:39 PM
Majority required - TE28.27 - Fletcher - motion 1
Toronto is at a pivotal economic moment. Global trade uncertainty, protectionist policies, and supply chain disruptions are reshaping how and where goods are produced. At the same time, Mayor Chow’s Economic Action Plan calls for strengthening Toronto’s economic resilience, protecting good jobs, and supporting domestic production. Now more than ever, it is essential that employment lands are clearly understood and actively positioned as a foundation of the city’s long-term economic competitiveness. The City’s Planning and Housing Committee will be considering four items at its January 22, 2026 meeting that reflect the growing pressure on Toronto’s employment lands. These are reports on applications that their respective applicants have appealed to the Ontario Land Tribunal, and they collectively raise fundamental questions about how and where employment uses can be sustained over the long term. While each item must be considered on its own merits, taken together they underscore the importance of acting within a narrowing window, and the broader challenge facing the city: balancing competing land-use demands while ensuring Toronto retains the space nee…
City Council · 2026-02-04 15:23 PM
Majority required - PH27.20 - Adoption of Planning and Housing Committee Recommendation 2 only
City Council · 2026-02-04 15:22 PM
Majority required - PH27.20 - Adoption of Planning and Housing Committee Recommendation 1 only
Planning and Housing Committee · 2026-01-22
Majority required
The City-owned sites addressed in this report are part of the City Council directed Toronto Builds (formerly Housing Now) initiative to develop housing, including affordable housing, on City owned land. In addition to a range of affordable and market housing, the proposal includes a childcare facility and street-fronting retail. The site, “1631 Queen Street East”, includes four addresses: 1631 and 1641 Queen Street East, 1090 Eastern Avenue, and a portion of land along the eastern edge of 1080 Eastern Avenue (See Attachment 1). The existing Toronto Community Housing Corporation (TCHC) building on 1080 Eastern Avenue will remain. Staff recommend approval of amendments to the Official Plan and Zoning By-law 569-2013. The proposed amendments would permit the development of a mixed-use mid-rise building on Queen Street East of up to 6 storeys (with a partial 7th storey containing only indoor amenity space), and a residential building along Eastern Avenue of up to 18 storeys. A development concept, as outlined in this report and which guides the amendments, demonstrates the opportunity to accommodate approximately 328 dwelling units, of which 20-30% will be affordable. Inve…
City Council · 2026-02-04 14:35 PM
Majority required - PH27.2 - Fletcher - motion 1
Planning and Housing Committee · 2026-01-22
Majority required
This report recommends approval of the application to amend the Official Plan and Site-Specific Zoning By-law 812-2022, which includes Section 37 provisions, to permit a 48-storey mixed-use building (166 metres, excluding mechanical penthouse) at 353-355 Sherbourne Street and 157 Carlton Street. The proposed building would contain approximately 440 residential dwelling units, including a minimum of 30% affordable dwelling units (presently 132 dwelling units). Schedule A to By-law 812-2022 is further recommended to be amended to allow greater flexibility in meeting higher tiers of the Toronto Green Standard. As part of the proposed development, the existing heritage designated church, St. Luke’s United Church, will be retained and adapted to provide a new residential lobby, 1,453 square metres of community space and improved public realm along Sherbourne Street, of which a minimum of 250 square metres would be secured as a Privately Owned Publicly-Accessible Space (POPS). A separate report from Heritage Planning regarding the proposed alterations to the designated heritage property will be considered by City Council in conjunction with this report. The applicant continues to…
City Council · 2026-02-04 12:23 PM
Majority required - TE28.12 - Adopt the item
This report recommends that City Council approve the alterations proposed for the property known as St. Luke's United Church at 353 to 355 Sherbourne Street and 157 Carlton Street, designated under Part V of the Ontario Heritage Act, in connection with an Official Plan and Zoning By-law Amendment application on the subject property, and that Council grant authority for the City to enter into a Heritage Easement Agreement with the owner. The subject property is located within the Cabbagetown Northwest Heritage Conservation District and contains the St. Luke's United Church complex. The property is identified in the Heritage Conservation District Plan as a significant building that contributes to the heritage character of the primarily residential district. The church, designed by Canadian architects Langley and Burke in 1887 as the Sherbourne Street Methodist Church has undergone a series of alterations and additions over the years. In 1912, a Sunday school, also designed by Langley and Burke, was added to the northeast corner. A narthex, designed by Toronto architects Wickson and Gregg, was added to the front of the church in 1929 and a gymnasium was constructed in 1962 in the sou…
City Council · 2026-02-04 12:22 PM
Majority required - CC36.10 - Adopt the item
This report recommends that City Council adopt the Scarborough Centre Secondary Plan (Secondary Plan) and other associated amendments found in draft Official Plan Amendment 871 (OPA 871) to guide the future growth and transformation of approximately 175 hectares of lands within Wards 21 and 24. The recommended Secondary Plan replaces the 2005 Scarborough Centre Secondary Plan and provides an updated planning framework that will guide new growth anticipated with the construction of a new subway station as part of the Line 2 East Extension. It establishes policies to create connected and sustainable communities, transforming the Scarborough Centre (Plan Area) from an auto-dependent environment into a pedestrian-oriented, transit-supportive place with an enhanced public realm. OPA 871 is the outcome of the Our Scarborough Centre Planning Study (OurSC Study), a multi-phased process launched in 2018 to comprehensively update the 2005 Secondary Plan and area planning framework. The scope of the study was intended to address updated provincial legislation, recognize the location of the new subway station, update the Vision and Planning Framework, consolidate area specific planning initia…
City Council · 2026-02-04 12:18 PM
Majority required - PH27.3 - Adopt the item as amended